|
Credentials
- Certified to ISO 9001:2000 (certificate; opens in a new window)
- Operations compliant with US MIL-1-45208A
Quality System Management
- Semiannual internal audits
- Ongoing system analysis
Corrective and Preventative Action Program
- Identification and segregation of nonconforming material
- Corrective action reports filed (provided upon request)
- Requirement for suppliers to have a corrective action plan
Documented Production Inspections
- First piece
- In-process
- Final
- Production Part Approval Process (PPAP) conducted upon request
Calibration Program
- NIST traceability
- Calibration of all gaging (documented and
tagged for verification)
- Annual calibration of surface plates, comparators,
hardness testers, thread plugs, rings, and master gaging
Standard Inspection Equipment
- Brown and Sharpe coordinate measuring machine, CMM, (18” x 20” x 16”)
- Suburban Tool 6 x 6 comparator
- Rockwell hardness tester
- 24” Mitutoyo height gage
- Mitutoyo profilometer (3)
- Granite surface plates (13)
- Gage blocks (8 sets)
- Deltronic gage pin sets (1/8”, 3/16”, 1/4”, 5/16”, 3/8”, 7/16”, 1/2”)
- Mitutoyo outside micrometers (0 - 20”)
- Sunnen dial ID bore gages (0 - 6”)
|